PREVIOUS PROJECT

Elko Generation Station

Project Detail:

Swansea Main Track Modifications Grading and Drainage

NEXT PROJECT

Northeast Stoney Trail

Project Description

Canadian Pacific selected MacKay as the successful proponent for the grading and drainage construction of the Swansea Main Track Modifications Project.
The project consisted of construction of a new mainline track and creation of a siding from the old mainline.
The existing box culvert was deemed to be at the end of its service life. The new precast box culvert was installed under the new siding and mainline track. The works were completed in under 24 hours to keep rail traffic disruption to a minimum.

Project Highlights

  • Mile 8 to Mile 10
  • No unscheduled disruption to rail traffic
  • Construction of pre-cast concrete box culvert under mainline and siding track completed in 24 hours

Project Details

  • Client: CP Rail
  • Value: $1.85M

Other Projects

Fort Macleod Infrastructure Infrastructure
Fort Macleod PTC Infrastructure
Beaver Valley Transportation
Swansea Quarry Pit Mining
https://www.mackaycontracting.com/

Since 1986, MacKay has worked to exceptional levels of efficiency, safety, and leadership.

Cranbrook
  • 1600A Theatre Road,
    Cranbrook BC V1C7G1

  • (250) 489-1858

Calgary
  • #3-2000 Pegasus Road,
    Calgary Alberta T2E 8K7

  • (587) 583-1132

Sparwood
  • 1102 Highway 3,
    Sparwood BC V0B 2G1

  • (250) 489-1858

© Mackay Contracting 2021. All Rights Reserved.